Archive

Montenegrin Academy of Sciences and Arts

Studio GRAD. Podgorica, Montenegro

  • Name of work in English

    Montenegrin Academy of Sciences and Arts

  • Name of work in original language

    Crnogorska akademija nauka i umjetnosti

  • Prize year

    EUmies Awards 2024

  • Work Location

    Podgorica, Montenegro

  • Studio

    Studio GRAD

EUmies Awards 2024 Nominees

  • © Relja Ivanić

  • © Relja Ivanić

  • © Relja Ivanić

  • © Relja Ivanić

  • © Relja Ivanić

  • Ground floor

    Ground floor

  • First floor

    First floor

PUBLIC BUILDING IN WHICH THE MOST IMPORTANT MONTENEGRIN INSTITUTION IN THE FIELD OF SCIENCE AND ART IS LOCATED. THE BUILDING WAS BUILT IN THE CENTRAL PART OF THE CAPITAL OF MONTENEGRO - PODGORICA, AS A WINING DESIGN ON ARCHITECTURAL COMPETITION.

Authors

Veljko Radulović, Branislav Gregović, Đorđe Gregović,

  • Program

    Mixed use - Cultural & Social

  • Labels

    Aggregation · Administration

  • Site area

    12479 m²

  • Client

    The government of Montenegro

  • Total gross floor

    4974 m²

  • Completion

    2022

THE ACADEMY BUILDING IS LOCATED IN THE PARK THAT SURROUNDS THE EXISTING SMALL ACADEMY BUILDING. THE BUILDING HAS THREE FLOORS AND THOUGHTLY PENETRATES INTO THE GROUND, PRESERVING EXISTING GREEN AND TOPOGRAPHY OF THE GROUND. THE ENTRANCE WAS ORGANIZED THROUGH THE SQUARE ALONG THE PUBLIC ROAD. THE RECEPTION HALL IS TWO-STOREY, FROM IT YOU ENTER THE UNDERGROUND MAIN GALLERY, AND CLIMB TO THE CENTRAL TWO-STOREY HALL WHICH IS ZENITALLY LIGHTED. PUBLIC SPACES OF THE ACADEMY AND OFFICE ARE ORGANIZED AROUND IT. THE MAIN CONFERENCE HALL IS FOCUSED ON THE PARK. ARCHIVES AND TECHNICAL ROOMS ARE LOCATED IN THE BASEMENT ZONE OF THE FACILITY. THE ARCHITECTURE OF THE BUILDING IS REDUCED, WITH THOUGHT PROPORTIONS AND RESTRAINED STYLISH EXPRESSION. STONE COVERING SUPPORTS THESE PROJECT OBJECTIVES.

THE CONSTRUCTION OF THE FACILITY TOOK FOR TWO YEARS. LARGE EXCAVATIONS OF THE SOIL WITH THE PRESERVATION OF EXISTING TREES WERE ESPECIALLY DEMANDING. LARGE RETAINING WALLS IN THE BACK OF THE BUILDING WERE THE MOST CHALLENGING PART OF THE INITIAL PHASE OF CONSTRUCTION. THE SIMPLE FORMS AND DETAILS CONDITIONED THE ABSENCES OF TECHNOLOGICAL PROBLEMS DURING THE WORKS.

THE CONSTRUCTION OF THE BUILDING IS DEMANDING BECAUSE IT SUPPORTS THE ARCHITECTURAL CONCEPT OF THE EMPHASIZED PUBLIC. THIS MEANS LARGE SPANS AND A LOT OF LIGHT IN THE INTERIOR. THIS HAS CONDITIONED THE APPLICATION OF THE SKELETON SYSTEM WITH CASSETTEED CEILINGS, AND THE CORRECT POSITIONING OF CONCRETE WALLS FOR THE STRENGTHENING OF THE OBJECT, BECAUSE THIS IS A VERY ACTIVE SEISMIC AREA.